More walls

Two more days of good progress - the concrete paths inside the extension were removed, and the floor filled with scalping and sand, and then covered with the DPM. And today Phil started on the blockwork on the inside of our kitchen - so I had to do a quick bit of kitchen design last night to confirm the exact position of doors and windows - making sure they wouldn't interfere with the positioning of our kitchen furniture.


In the garage, a large 1m x 1m x 1m hole has appeared (after a lot of hard work from Merrick). Unfortunately he didn't find any oil (or buried treasure), so it will be filled with concrete to form the base of a pier which will support the steelwork supporting the new bedroom above the garage.

The building inspector visited today, and is happy with progress.